Lee Woodcock, Key Account Manager at Polypipe Civils & Green Urbanisation, said: “Working with the sub-contractor Hannon Brothers Ltd, we were able to provide a range of products for this project, including Ridgidrain, Ridgistorm-XL and Ridgistorm-XL Fabrications. We also benefitted from extremely early involvement in the project, and our in-house technical team were instrumental in undertaking the appropriate checks – for contamination, for example - and providing the drawings for the project, also flagging any potential bumps in the road in advance.”
“Starting this project, and with the assistance of the Polypipe CGU technical team, we learnt that there was a high water table, and there was a need for a lot of pipework to come into one configuration, so we were very worried about keeping the water integrity,” Craig Clark, Hannon Brothers’ Contracts Director, said, “this meant that, for our drainage solution, we needed a continuous product – a full, pre-made, accessible solution.